Location: Toronto, ON
Client: Cadillac Fairview
Year: 2024
Type: Commercial Retrofit
This downtown office tower underwent a phased deep energy retrofit targeting envelope performance, mechanical upgrades, and smart controls. SBC provided integrated design facilitation across the project lifecycle.
The enclosure was upgraded with high-performance glazing and continuous insulation, while the heating plant was electrified with high-efficiency heat pumps. Real-time monitoring confirmed a 38% reduction in operational energy intensity within the first year.



